Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 13, 2023

No Information to Display

To Be Determined

Paving, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

To Be Determined, Bowling Green, KY

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

This project is targeted to maintain sidewalks throughout the city in as good of a condition as possible to provide a pedestrian transportation alternative. The emphasis is on replacement of broken, uneven sidewalks and/or curb and gutter in need of rehabilitation to reduce tort liability and routine maintenance costs. Additionally, staff inspect and recommend improvements that will allow for ADA compliance according to federal standards. A GIS application enables staff to conduct a more efficient and thorough process to identify and prioritize areas with potential trip hazards and ADA compliance issues along existing city sidewalk segments. In 2016, the entire network of sidewalks and ramps within the city was inspected. Since that time, the city has been divided into "sidewalk zones" in an effort to allow for annual inspection and rehabilitation efforts within each zone as funds allow. The focus of the evaluation is to identify trip/safety hazards, missing, and/or severely damaged sidewalk segments as well as ADA compliance issues. These funds will be used to address the repairs utilizing both in-house staff (Operations Division Concrete Crew) and with outside contractors. As of October 26, 2023, the project is included in the City's 2022-2026 Capital Improvement Program (CIP). Per owner, no engineer or design team. Construction is scheduled to begin November 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.