Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$182,899.00

Public - City

img_map_placeholder

Multiple Locations, Newcastle, WY

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

**As of October 25, 2023, project was awarded to Sacrison Paving Inc awarded amount is $182,899.50 ** The Work Shall Consist of Asphalt Paving, Rotomilling, Asphalt Overlay, and Other Related Items. The Owner May Reject Any and All Bids and Reserves the Right to Waive Minor Irregularities in Any Bid. Each Bid Must Be Accompanied by Bid Security Payable to the City of Newcastle for 5% of the Total Amount of the Bid, to Be Forfeited to the Owner as Liquidated Damages if the Bidder is Awarded the Contract and Fails to Enter Into an Agreement With the Owner Within Thirty (30) Days From His Notification. All Bids Shall Remain Open for Forty-five (45) Days After the Day of the Bid Opening. The Successful Bidder Shall Perform the Work and Furnish a Performance Bond and a Payment Bond, Each in the Amount of 100% of the Contract Price With a Corporate Surety Approved by the Owner. The Contractor Shall Guarantee All Materials and Equipment Furnished and Work Performed for a Period of One Year From the Date of Final Acceptance. The Performance Bond Shall Remain in Full Force and in Effect Through the Guarantee Period. The Notice to Proceed Shall Be Issued Within Thirty (30) Days of the Execution of the Agreement by the Owner. If the Notice to Proceed is Not Issued Within This Period, This Period May Be Extended by Mutual Agreement Between the Owner and the Contractor. If the Notice to Proceed Has Not Been Issued Within the Thirty (30) Day Period or Within Any Mutually Acceptable Extension Thereof, the Contractor or the Owner May Terminate the Agreement on Written Notice to the Other Party, and in Such Case, There Shall Be No Liability Under the Agreement or Otherwise on the Part of Either Party. Contracts Will Be Awarded to the Lowest Bidder Who Has Met the Minimum Requirements Set Forth in Article 3, Instructions to Bidders, and Who is Determined to Be Responsible in the Sole Discretion of the Governing Body. Resident Wyoming Laborers, Workmen and Mechanics Shall Be Used Upon All Work in This Contract Whenever Possible. Pursuant to W.s. 16-6-106, Preference is Hereby Given to Materials, Supplies, Agricultural Products, Equipment, Machinery and Provisions Produced, Manufactured, Supplied or Grown in Wyoming, Quality Being Equal to Articles Offered by the Competitors Outside of the State.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.