Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

December 7, 2023

No Information to Display

419 N Dean St

Demolition, Site Work

No Information to Display

$55,000.00

Public - City

img_map_placeholder

419 N Dean St, Adrian, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

A. This division includes the demolition and removal of foundation. B. Existing rubbish, trash and junk apart from that of demolished building shall be removed and the entire site left clear of such materials. Except as otherwise shown or stipulated, the demolition work herein stipulated shall be carried to completion. C. All demolition and constructions shall be done in accordance with procedure as established at time of signing the Contract and which shall be scheduled in cooperation with the owner's occupancy requirements and with a minimum of inconveniences to the other. D. In accordance with the Air Pollution Control regulations of the Michigan department of Public Health, the open burning of debris from demolition of building will not be permitted. The contractor shall dispose of all debris in a sanitary landfill that has been approved by local authorities having jurisdiction. Demolition of 419 N Dean Street. Remove house and foundation, any contents, all outlying buildings, removal of sidewalk from street to house, seed and straw; disposal of building material, landfill charges, clean backfill. Contractor will repair any damage to public sidewalk, etc. resulting from this work. Contractor is responsible for obtaining all necessary permits. Existing rubbish, trash and junk apart from that of demolished building shall be removed and the entire site left clear of such materials. Except as otherwise shown or stipulated, the demolition work herein stipulated shall be carried to completion.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects