Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 26, 2023
November 27, 2023
November 27, 2025
8665 Boca Ciega Dr
Site Work
No Information to Display
$762,000.00
Public - City
8665 Boca Ciega Dr, St Pete Bch, FL
Question Deadline 10/18/2023 at 10:00 AM ET Addendum 1 extended deadline for questions from 10/11/23. All questions pertaining to the terms and conditions or scope of work of this Request for Bid (RFB) must be sent in writing (e-mail is acceptable) to the City Procurement Manager and shall be received The Contractor shall furnish all labor, material, equipment and incidentals necessary for Pump Station 1 Rehabilitation including, but not limited to, temporary by-pass pumping, dewatering, force main and gravity main connections, testing, pavement restoration, maintenance oftraffic, and construction of new force main, lift station, gravity main, manholes, odor control equipment, elevated platforms, driveways, valves, and appurtenances. The work shall also include furnishing all labor, material, and equipment necessary for site restoration including but not limited to fill replacement, landscaping, irrigation, grading, pavement repair and replacement, pavement striping, and concrete curb installation. The Contractor shall furnish all labor, superintendence, materials, power, light, heat, fuel, water, tools, appliances, equipment, supplies, shop drawings, working drawings and other means of construction necessary or proper for performing and completing the work. The Contractor is responsible for obtaining all required permits necessary for the work, including all applications and review fees, other than those permits which may have already been obtained. The Contractor shall perform and complete the work in a speedy and efficient manner consistent with safety of life and property and to the satisfaction of the City, and in strict accordance with the Contract Documents. The Contractor shall repair or restore all structures and property damaged or disturbed during performance of the work. The cost of incidental work described in this General Section, for which there are no specific Contract Items, shall be considered as part of the general cost of doing the work and shall be included in the prices for the various Contract Items. No additional payment will be made. The Contractor shall be solely responsible for the means and methods of construction and the adequacy of his workmanship, materials and equipment. Working drawings and sketches showing work location, pump location, piping layout & routing. Show all proposed encroachment and access impacts on adjacent properties or facilities. Pump, control, alarm and pipe specifications or catalog cuts. Detailed sketch of controls and alarm system. Power requirements and details on methods to provide by-pass power or fueling. Calculation and determination of response times to prevent an SSO after a high-water alarm. Procedures to be taken in case of power, pump, or piping failures; including contact names and numbers for emergency notifications. Frequency and specific responsibility for monitoring pump operation, fuel levels, pump maintenance and entire length of piping
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
St Pete Bch, FL
Bid Date: Aug 20 2024
St Pete Bch, FL
Bid Date: Oct 17 2023
St Pete Bch, FL
Bid Date: Aug 31 2023
St Pete Bch, FL
--
St Pete Bch, FL
Bid Date: Aug 25 2023
Fort Pierce, FL
Bid Date: Sep 21 2023
Melbourne, FL
Bid Date: Nov 14 2023
Aventura, FL
Bid Date: Nov 13 2023
Merritt Island, FL
Bid Date: Sep 21 2023
Boynton Beach, FL
Bid Date: Sep 21 2023
Palmetto Bay, FL
Bid Date: Nov 30 2023
Lake Worth Beach, FL
Bid Date: Nov 16 2023
Midway, FL
Bid Date: Nov 09 2023
Palm Coast, FL
Bid Date: Nov 29 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
