Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 9, 2023

December 8, 2023

March 14, 2025

To Be Determined

Renovation

No Information to Display

$1,715,200.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Tennessee Colony, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

September 13, 2023 3:00 p.m Last Day to Submit Written Questions for Clarification to the Department This project is to replace the mechanical parts of the clarifier at the wastewater treatment plant - WWTP - Michael Unit packing plant located in Tenessee Colony Replace clarifiers mechanical parts. The clarifiers concrete containment is in reasonable condition; however, the metal components are non-compliant. The old metal components shall be removed and disposed of. The interior concrete clarifier shall be repaired and coated with a protective liner. New components to be installed shall include a new drive assembly, scraper mechanism, skirt, effluent weir, effluent pipe, inlet through, race skimmer, bridge assembly with handrail, scum pipe with lever arm and electrical services. - WWTP - Michael Unit Packing Plant, Tennessee Colony, Texas as shown by the construction plans as prepared by Engineering Company / TDCJ. Contractors are required to submit a HUB Subcontracting Plan as detailed in Exhibit 1. Failure to submit a completed HUB Subcontracting Plan will result in the bid being rejected from further consideration Contractor must provide evidence that demonstrates the contractor is qualified to satisfactorily perform the specified work and, the contractor shall submit written evidence to include a minimum of three (3) projects completed within the last ten (10) years of similar work, size, and complexity to include the owner's name, telephone number, location, type of facility, construction cost and the date of completion with all bid proposals. Contractor must be bondable and insurable at the levels required. All bid proposals must be accompanied by a Bid Deposit in the amount of 5% of greatest amount bid. Performance and Payment Bonds in the amount of 100% of the contract amount will be required upon award of a contract. The TDCJ reserves the right to reject any or all bids, and to waive any informality or irregularity. It is the TDCJs intent to issue the Notice to Proceed at the Pre-Construction Meeting with the performance period to begin upon issuance.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.