Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2023

November 16, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

$400,000.00

Public - City

img_map_placeholder

Multiple Locations, Crystal City, TX

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

THE HOUSING AUTHORITY OF THE CITY OF CRYSTAL CITY IS REQUESTING BIDS FOR THE RENOVATION (LABOR ONLY) OF 15 DWELLING UNITS (6-2BDRMS, 6-3BDRMS & 3-4BDRMS) Removing entire popcorn ceiling throughout entire unit. Removing and replacing all patched, damaged, or stained walls, texture & repaint entire unit. Removing all layers of floor tile and placing WITH new floor tile throughout the entire unit. Replacing all baseboards/trim throughout unit and install new painted ones install completely painted exterior/interior doors. Replacing Doorknobs and Door Stops throughout entire unit. Replace & install light fixtures, light switches, electrical outlets & cover plates & ceiling/wall vents. kitchen faucets replaced, cabinets repaired & repainted entirely (in/out) or replaced. Bathroom replacement of new tub, tub surround, shower faucets and shower-head, vanity lavatory with p-trap & faucets & commode, replace cut off valves. Remove ceiling & walls and install new water-resistant Sheetrock and paint, install new vent/light/heater fixture. ANY additional findings that need to be repaired or replaced will be done once Working Foreman and Manager give approval. Complete cleanup of entire unit buff & wax floors, dispose of all materials except for cut off valves. Must return to working foreman Jose Sanchez. TURN KEY PROJECT Interested Contractors please call Jose Sanchez, Working Foreman at (830) 374-7003 to familiarize themselves with the scope of the work.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.