Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

December 14, 2023

No Information to Display

Multiple Locations

Asbestos Abatement, Demolition

No Information to Display

$393,000.00

Public - City

img_map_placeholder

Multiple Locations, Greenville, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of October 26, 2023, this project has not yet been awarded. A timeline for award has not yet been established. As of October 17, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The F.P. Joy Building consists of a two story, partial third floor & partial basement masonry, wood & concrete construction. Asbestos is present please refer to Asbestos Report Section 02082 - Asbestos Abatement. First Floor is approximately 6,829 s.f.: Second Floor 5,926 s.f.; Partial Third Floor 3,3,20 s.f. & Partial Basement 1,927 s.f. The entire structure shall be removed including all foundations. The party wall and roof of Mario's Pizza to the east shall be protected during demolition. All utilities for F.P. Joy shall be disconnected and removed as indicated on the drawings. Asbestos Removal and Abatement shall be apart of Contract No. 1. The Annex Building and Bond Co. Superintendent Building consists of a single story masonry, wood & concrete construction. First floor is approximately 6,590 s.f. w/ a partial concrete basement 6'-0"+/- deep at approximately 628 s.f. Asbestos is present please refer to Asbestos Report Section 02082 - Asbestos Abatement.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects