Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

February 8, 2024

June 26, 2024

Multiple Locations

Site Work

No Information to Display

$4,300,000.00

Public - City

img_map_placeholder

Multiple Locations, Berkeley, CA

Subscribe to View Full Documents

Question Deadline 10/10/2023 at 5:00 PM PT The work of this contract is briefly summarized as follows: The work to be done consists of, but is not limited to: a) Point (spot) repairs of sanitary sewer line at various location. This work requires coordination with City and private property owners b) CIPP lining (Method "A") of approximately 873 linear feet of 6-inch and 8-inch diameter sanitary sewer mains. c) Pipe-bursting (Method "B") of approximately 3,814 linear feet of 6 to 12-inch diameter sanitary sewer mains. d) Traditional Open-trench (Method "C") replacement of approximately 453 linear feet of 6 to 12-inch diameter sanitary sewer mains. e) Slip lining of approximately 183 linear feet of 8-inch diameter sanitary sewer main f) Construction and rehabilitation of maintenance holes, including excavation and related work. g) Abandonment of sanitary sewer mains and structures, as indicated in plans. h) Replacement in kind of concrete stairway and metal handrail. i) Traffic Control Plans (TCP) shall emphasize pedestrian, bicycle, safety and access. TCP shall be prepared to avoid and minimize construction impacts on pedestrian, bicycle, and bus facilities in Berkeley consistent with the City's policies. TCP shall follow guidance and intent provided in Appendix 10. j) Work sites within City of Berkeley Fire Zone 2 are subject to restrictions imposed during the Red-Flag warnings. k) Portions of the work sites are located on private properties with limited access. Traffic Control Plans (TCP) must be prepared to avoid and minimize construction impacts on pedestrian, bicycle, and bus facilities in Berkeley consistent with the City's policies. TCP must follow guidance and intent provided in Appendix. Project includes sites located within City of Berkeley Fire Zone 2 which are subject to restrictions imposed during Red Flag Warning events declared by the City of Berkeley. California Contractor License Classification required: A General Engineering, or C-34 Pipeline, or C-42 Sanitation System. Pre-Award Conference: The apparent low bidder will be invited to a pre-award conference scheduled for 11:30 A.M., Tuesday, December 5, 2023 at 1947 Center Street, 4th Floor, Berkeley, CA.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.