Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 3, 2023

December 27, 2023

October 14, 2024

100 Morrissey Blvd

Renovation, Site Work

No Information to Display

$6,135,700.00

Public - State/Provincial

img_map_placeholder

100 Morrissey Blvd, Boston, MA

Subscribe to View Full Documents

The Phase 1B Masonry Repair Project encompass the removal of existing brick as noted, abatement of existing waterproofing, repairs to concrete and masonry back up wall, installation of new brick at the existing substructures under McCormack, Wheatley, and parts of Quinn buildings. All questions by prospective bidders must be submitted in writing via email to mboyle@umassp.edu. The work to be done under this contract consists of executing and completing all work required for the University of Massachusetts Building Authority's Phase 1B Masonry Repairs UMBA Project # 22-B2 at UMass Boston. The Phase 1B Masonry Repairs Project includes the removal of existing brick and CMU as noted, abatement of existing dampproofing, repairs to concrete and masonry back up walls, installation of new CMU back up walls, installation of new waterproofing, and installation of new brick at the existing substructures at McCormack, Wheatley and parts of Quinn buildings. Work shall also include removal and reinstallation of utilities to facilitate installation of new construction, site work, and obtaining all necessary licenses, permits, and certificates. Where utilities exist within and adjacent to the building(s) and ancillary parking lots, and are known by the Owner, they have been shown on the site plan(s) appearing in, but not restricted to, the exhibits. Connections to these existing utility lines will be the responsibility of the Contractor. Question Deadline 10/16/2023 at 2:00 PM ET Questions must be submitted in writing to jlemire@umassp.edu.

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.