Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

September 23, 2024

November 11, 2024

Interstate 80

Paving, Site Work

No Information to Display

$300,000.00

Public - State/Provincial

img_map_placeholder

Interstate 80, Lincoln, NE

Subscribe to View Full Documents

Prior to the letting, any questions pertaining to the Special Provisions or the Plans for this project should be submitted to NDOT in a written format through the Bid Express (BidX) website at https://www.bidx.com/ne/lettings. Likewise, NDOT will post answers exclusively to the BidX website. All official answers will be identified as Authorized by NDOT. Questions will not be answered verbally. Camera tower located approximately 65 ft north of the abutment of the overhead structure, and 35 ft east of the centerline. Conduit is bored from the camera tower to the westside of the L80F orthogonally and beneath the pavement. Auto-gates exist at the eastbound and westbound on ramps of the interchange.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.