Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

April 1, 2024

September 22, 2026

To Be Determined

Paving, Site Work

No Information to Display

$35,000,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Boston, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Deadline for submission of written questions FRIDAY, OCTOBER 6, 2023 at 5:00PM The MASSACHUSETTS PORT AUTHORITY (Massport) is soliciting Construction Management at Risk Services for MPA PROJECT NO. L1697 - TERMINAL B ROADWAY AND GARAGE OPTIMIZATION (the project). In accordance with Massachusetts General Laws, Chapter 149A, Sections 1 thru 13, Massport is seeking a highly qualified and competent Construction Manager (CM) to provide preconstruction services and implement the construction of the Project in accordance with an agreement where the basis for payment is the cost of the work plus a fee with a negotiated guaranteed maximum price. This Request for Qualifications (RFQ) is being utilized to prequalify and shortlist CM firms who will be invited to submit proposals in response to a Request for Proposals (RFP) to be issued by Massport. The project will separate passenger cars from buses at the roadway curbsides on the arrivals level at Terminal B. This will be done by repurposing the Level 1 garage interior to install travel lanes and new curbs for passenger pick-up. The modification includes moving the limousine pool from inside garage to the Level 2 horseshoe curbside, and relocating taxi and shuttle stands to the Piers A and B curbs on Level 1. The project will reallocate space for buses and shuttle buses at the Piers A and B curbs for optimization, improved passenger safety, and will provide ADA/accessibility improvements. The project includes new pavement markings, regulatory and wayfinding signage modifications, lighting upgrades, and comprehensive structural repairs throughout the garage on all levels and roadway on the departure level. To accommodate access to structural repair locations, MEP/FP systems may be relocated. On Level 1, stormwater drainage improvements are included. All questions relative to your submission shall be directed to CPBidQuestions@massport.com.

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.