Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

January 1, 2024

December 31, 2025

E 56th Ave & Telluride St

New Construction, Site Work

No Information to Display

$19,660,000.00

Public - County

img_map_placeholder

E 56th Ave & Telluride St, Denver, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000331283 The City and County of Denver (City) is soliciting qualifications from interested firms to provide Construction Management/General Contractor (CM/GC) services for the planned new build of Denver Fire Station 40, located at 56th Avenue and Telluride Street. The goal of the project is to reduce fire response time in the Northeast Denver community. Primary scopes of work include apparatus bay, living quarters, decontamination area, technology communication systems, traffic signal, communication tower, landscaping, and water quality. This project is part of the 2017 Elevate Denver Bond Program, which is a 10-year, $937 million general obligation bond program approved by voters in 2017. Purchase Type Term: 01/01/2024 - 12/31/2025 Question Acceptance Deadline 10/12/2023 at 3:00 PM MT Questions are submitted online No -- All inquiries and questions regarding this RFP shall be directed to Cindy Ackerman in the DOTI Contract Administration Department in writing via email to doti.procurement@denvergov.org. Participation Requirements - Minority Business Participation - Women-Owned Business Participation General Requirements - Bidder Prequalification/Preregistration Required - Insurance Required - Prevailing Wage Required The contract goal of MWBE participation is 20% Project design and construction are being funded by the Elevate Denver Bond Program, Gateway Impact Fee, CCP, and SRF Traffic Signal for a total of $19.66 million. The budgetary cost estimate for construction is approximately $14.75 million. *As the City's best interests may appear, the Executive Director of Transportation and Infrastructure (DOTI) reserves the right to waive informalities in, and to reject any or all, proposals.

106 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.