Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

February 1, 2024

April 30, 2025

950 4th St SW

Addition, Demolition, Paving, Renovation, Site Work

No Information to Display

$9,300,000.00

Public - County

img_map_placeholder

950 4th St SW, Moultrie, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The CCSD will select the most qualified and responsive construction firm to enter into a Construction Management at Risk contract for the construction of the above referenced project. Award of the contract will be based on an evaluation of all required submittals noted in the RFP and, if needed, interviews. This project will consist of demolition of two existing structures, relocation of utilities, asphalt parking areas and drives, and constructing a 16-classroom addition with a connecting corridor to the existing school of approximately 18,600 square feet, a cafeteria addition of 1,200 square feet, and the interior renovation of the existing art room. The approximate budget for the project is $9,300,000 The selected Contractor will be required to provide a 100% Payment Bond and a 100% Performance Bond for the entire amount of the cost of construction. The Proposal shall include a letter from a bonding company indicating its willingness to issue said payment bond and a performance bond for this project. Bonds for this project shall be issued by a bonding company listed in the current edition of the Federal Register as a surety, must be kept in force for the duration of the contract, executed by a resident agent of the State of Georgia and be in compliance with Georgia Revised Statutes. Deadline for Questions: 10/18/2023 Announcement of Successful Contractor or Shortlist Selection Announcement: 11/01/2023 Interviews (if deemed necessary): 11/06/2023 (time TBD) Announcement of Successful Contractor 11/27/2023 Anticipated Preconstruction Period 12/2023 - 01/2024 Anticipated GMP Approval January 30, 2024 Anticipated Construction Begin/End Date 02/2024 - 04/2025 Please direct all questions regarding this RFP to; Jeremy Jones with Colquitt County School District, jeremy.jones@colquitt.k12.ga.us and Travis Petitjean with Altman + Barrett Architects. tpetitjean@altmanbarrettarchitects.com. The CCSD reserves the right to select or reject any and all responses as a result of this Request for Proposal. The CCSD is not liable for any costs incurred by any person or firm responding to this Request for Proposal.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects