Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

February 1, 2024

April 30, 2025

105 Darbyshire Rd

Addition, Demolition, Renovation, Site Work

No Information to Display

$7,000,000.00

Public - County

img_map_placeholder

105 Darbyshire Rd, Norman Park, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The CCSD will select the most qualified and responsive construction firm to enter into a Construction Management at Risk contract for the construction of the above referenced project. Award of the contract will be based on an evaluation of all required submittals noted in the RFP and, if needed, interviews. It is the intent of the Owner to enter into a Construction Management at Risk agreement with one incorporated firm. Submission of proposals indicates Respondent's acceptance of the evaluation technique and Respondent's recognition that some subjective judgments must be made by the CCSD during the determination of ranking order and award. Project Description: This project will consist of constructing a 16-classroom addition with a connecting corridor to the existing school of approximately 18,000 square feet. Although the site is relatively small, the existing site has considerable elevation change, therefore the building addition includes interior ramps and significant footing steps to accommodate the elevations. The project involves relocation of existing utilities as well. Deadline for Questions: 10/18/2023 Please direct all questions regarding this RFP to; Jeremy Jones with Colquitt County School District, jeremy.jones@colquitt.k12.ga.us and Travis Petitjean with Altman + Barrett Architects. tpetitjean@altmanbarrettarchitects.com. Announcement of Successful Contractor or Shortlist Selection Announcement: 11/01/2023 Interviews (if deemed necessary): 11/06/2023 (time TBD) Announcement of Successful Contractor 11/27/2023 Anticipated Preconstruction Period 12/2023 - 01/2024 Anticipated GMP Approval January 30, 2024 Anticipated Construction Begin/End Date 02/2024 - 04/2025 The CCSD reserves the right to select or reject any and all responses as a result of this Request for Proposal. The CCSD is not liable for any costs incurred by any person or firm responding to this Request for Proposal. The Submitter shall hold harmless and indemnify the Owner, the Architect, and other design consultants against all claims, suits, actions, costs, counsel fees, expenses, damages and/or judgements or decrees by reason of persons or property being damaged or injured by the Contractor or any of the Contractor's employees/subcontractors in any capacity during the progress of the work, whether by negligence or otherwise.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.