Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

April 1, 2024

October 31, 2024

County Rte 35

Paving, Site Work

No Information to Display

$2,203,899.00

Public - County

img_map_placeholder

County Rte 35, Norwood, NY

Subscribe to View Full Documents

St. Lawrence County reserves the right to consider the bids for forty-five (45) days after receipt before awarding any Contract, and to waive any minor informalities in, and to reject, any and all bids. The EEO Employment goals for this project are: 2.5% Minority Employment Goal , 6.9% Women Employment Goal The Owner is St. Lawrence County, and the work site is located in the Town of Potsdam. The project limits extend from approximately 425 feet south of the existing bridge to approximately 250 feet north of the existing bridge, including work along Morley-Potsdam Road from approximately 440 feet west of County Road 35 to approximately 285 feet east of County Road 35. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including, but not necessarily limited to the following: complete removal of the existing bridge superstructure with partial removal of existing bridge substructures and replacement with a new single span, steel multi-girder superstructure and a monolithic concrete deck slab, construction of integral abutments founded on piles, construction of approach slabs at each end of the bridge, re-alignment of Trout Brook within the project limits, re-alignment of the intersections of Morley-Potsdam Road and County Road 35, installation of SPDES storm water treatment swales and drainage, and reconstruction of roadway approaches as required to accommodate bridge replacement efforts.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.