Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

October 30, 2023

May 28, 2024

101 E Superior St

Site Work

No Information to Display

$500,000.00

Public - County

img_map_placeholder

101 E Superior St, Fort Wayne, IN

Subscribe to View Full Documents

All questions about the meaning or intent of the Bidding and Contract Documents are to be directed to Engineering Resources, Inc., 4175 New Vision Drive, Fort Wayne, IN 46845. Interpretations or clarifications considered necessary by Engineering Resources in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineering Resources as having received the Bidding Documents. Questions received less than three days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Bud Meeks Lift Station Improvements 2023 Site Directions: Bud Meeks Justice Center, 101 E. Superior Street, Fort Wayne, IN 46802 Improvements will include replacement of lift station piping and accessories, access hatch enhancements, electrical improvements, and related lift station rehabilitation work. These Specifications and the accompanying Drawings describe the Work to be done and the materials to be furnished for the construction of the Allen County Bud Meeks Lift Station Improvements 2023 project. The Contractor shall complete all work for completely functional street improvements as specified or indicated in the Contract Documents. The Work is generally described as follows: 1. Lift Station and Valve Vault Improvements a. Remove and replace existing pump discharge bases, pump guide-rail upper support brackets, discharge piping, pipe supports, anchors, valves, drain pipe, pressure gauge assembly, and pipe accessories. Remove and replace buried discharge piping up to 5 feet outside of valve vault. Tie into existing PVC force main. b. Furnish and install retro-fit safety grate within existing wet well opening. c. Protect equipment to remain, including (2) ABS Pumps and (1) Level Probe, along with their associated control wiring. d. Remove grinder guide-rail support brackets. Remove and properly dispose of solid materials within the wet well. Cleaning beyond removal of materials shall be sufficient for proper safety and quality of workmanship. e. Surface restoration, including removal of tree and replacement of bushes. 2. Electrical Improvements a. Remove existing junction box within lift station b. Furnish and install pull box, junction box, new circuit for existing pumps, and all associated conduit and wiring for a complete and functional electrical system.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects