Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2023

November 22, 2023

March 21, 2024

Multiple Locations

Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Multiple Locations, Keene, NH

Subscribe to View Full Documents

The Sewer Standpipe Replacement Project consists of the following tasks: Provide sewage bypass pumping to accommodate a peak measured flow for 6 sewer main approximately 20 GPM for distances as required for each activity. Replace 14 existing sewer standpipes with a standard 4 ft. diameter precast concrete sewer manhole and two additional new sewer manholes, which totals 16 manholes. Connections to existing pipes will be made using same size SDR-35 PVC pipes.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.