Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

November 13, 2023

December 31, 2023

Kerr Ave

Site Work

No Information to Display

$300,000.00

Public - County

img_map_placeholder

Kerr Ave, Emlenton, PA

Subscribe to View Full Documents

Venango County is requesting sealed proposals for a project to improve stormwater infrastructure, along Kerr Avenue, Emlenton. The County reserves the right to accept or reject any bids. All bidders are hereby notified that minorityowned and womenowned businesses will be afforded full opportunity to submit bids and will not be subject to discrimination on basis or race, color, sex, or national origin in consideration of this award. Venango County is requesting bids for contractor services relating to the improvement of a Stormwater System, running beneath Kerr Avenue, in Emlenton, Venango County. Subsurface runoff from the adjacent hillside is daylighting/discharging on to the shoulder of Kerr Avenue, between Chestnut Street and Hill Street. This additional drainage has been requested to be controlled earlier rather than continue discharging onto the street and continuing downslope. As a result, two new 2' x 4' storm inlets are planned to be placed off the roadway, to the immediate north of Kerr Avenue upgradient of the existing storm sewer system that begins approximately 100' northwest of the intersection between Kerr Avenue and Hill Street. The new pipe runs will be comprised of smooth-lined HDPE and will be 12-inch in diameter. Additionally, a 6-in. diameter perforated pipe will be placed immediately above the 12-in. HDPE with the intention of catching spring runoff that may be running under the road surface. The 12- in. diameter was selected as the maximum pipe size of the existing downstream system is also 12-in. The expansion project will consist of 313 ft. (new runs of 213 ft. and 100 ft.) of new HDPE pipe. The new expansion will allow for the additional subsurface runoff to get into the storm sewer system much quicker than if it were allowed to continue along the shoulder of Kerr Avenue before entering. The existing storm sewer system was not modeled as part of the project. After inspection deems project completed, to specifications, any cuts in road surface to be paved to match existing grade. This construction activity will be funded by Community Development Block Grant (CDBG) funds. Hence, all relevant federal requirements of the program shall apply as outlined in the bid documents (see General Conditions).

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.