Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

No Information to Display

9751 Duncan Lake Ave SE

Remodeling, Renovation

No Information to Display

$110,000.00

Public - City

img_map_placeholder

9751 Duncan Lake Ave SE, Caledonia, MI

Subscribe to View Full Documents

A. Work shall include furnishing all labor, materials, equipment, and service necessary for a complete and operating Building Management System (BMS), utilizing direct digital controls. The BMS shall be capable of total integration of the facility infrastructure systems with user access to all system data either locally over a secure Intranet within the building or by remote access by a standard Web Browser over the Internet. This shall include HVAC control, energy management, alarm monitoring, security and personnel access control, and all trending, reporting and maintenance management functions related to normal building operations all as indicated. 1. All labor, material, equipment and software not specifically referred to herein or on the plans, required to meet the functional intent of this specification, shall be provided without additional cost to the Owner. B. New Work shall communicate with and be integrated into Owner's existing campus energy management system. Existing system is serviced by and new Work shall be performed by Controls Solutions Inc. C. Work shall include but not limited to providing controls and instrumentation in accordance with equipment sequence of operations and their point lists. Point lists shall be a guide to the points required for control system. Final points required shall be determined by sequence of operation requirements. D. Work required in this section shall include providing all control components, control wiring, and services required for the connection and operation of the exhaust fans as indicated on drawings, and as specified in Section 23 3423 HVAC Power Ventilators . E. Work required in this section shall include providing all control components, control wiring, and services required for the connection of the remaining equipment as indicated on drawings, as specified in various Division 23 sections.. F. Work required in this section shall include the complete Building Management System (BMS) including all controllers Interoperable LonWorks Controllers (ILC), Interoperable BACnet Controllers (IBC), control devices, control panels, controller programming, controller programming software, controller input/output wiring, power wiring, interlock and safety wiring, graphical user interface, Graphical User Interface (GUI), Graphical Development Tool (GDT), Network Area Controller(s) (NAC), server software, controller software and programming of the NAC and server, development of all graphical screens, setup of schedules, logs and alarms, global server software control applications, system integration and coordination of the NAC and server software to the Wide Area Network. Remodel of 10,670 square feet for YMCA Childcare including mechanical and electrical.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.