Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 9, 2023

January 8, 2024

January 8, 2025

12th St

Site Work

No Information to Display

$2,000,000.00

Public - County

img_map_placeholder

12th St, Lanai City, HI

Subscribe to View Full Documents

The project involves various civil and electrical improvements related to the installation of floating aerators and a floating tile cover and baffle system at the Lanai Wastewater Reclamation Facility. Bidders shall be licensed in accordance to Chapter 444, HRS, relating to the licensing of Contractors. The Contractor, and his subcontractor(s), if any, shall comply with all applicable revisions of the law relative to the Prevailing Wage Schedule, as required under Chapter 104, HRS. Interested parties may contact the County Project Manager, Ms. Deborah Aweau, at (808) 876-4524 for directions to the site or with questions about the project. No proposal will be considered unless accompanied by one of the following forms of bidder's security: cash, a cashier's check, a certified check on a bank insured by the Federal Deposit Insurance Corporation, or a bidder's bond executed by an approved surety insurer, made payable to the County of Maui in the manner, form, and amount required in Section 103D-323 of the Hawaii Revised Statutes. The proposal guaranty shall be equal to at least five percent (5%) of the total of the bid submitted. Bidders must correctly prepare and submit the documents listed in Section 00300, Proposal. Work under this contract consists of the addition of high-speed floating aerators in the Stabilization Ponds No.1-No.4, partial covers on Stabilization Ponds No.2 and No.4, and electrical modifications and upgrades to support the new aerators. These improvements consist of the following major elements: Installation of high-speed floating aerators o Four high-speed floating aerators each in Stabilization Ponds No.1 and No.3 o One high-speed floating aerator each in Stabilization Ponds No.2 and No.4 o Aerator installation will include anchor posts, anchor cables, power cables, anti-erosion plates, and cable floats o Cutouts on the existing baffle wall in Stabilization Pond No.3 to accommodate the new aerator anchor cables Installation of partial covers with baffle curtains o A floating tile cover and baffle curtain system will be installed in Stabilization Ponds No.2 and No.4 o Cover and baffle system will include baffle anchor cables, and baffle anchor posts o Cutouts on the existing baffle wall in Stabilization Pond No.2 to accommodate the new baffle anchor cables o Anchoring at the existing chlorine contact tank in Stabilization Pond No.2 Electrical modifications o Motor control center for the aerator motors o Control panel for aerator timers o Conduit and power to ponds for aerators o Combination disconnect switches and receptacles

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects