Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

April 8, 2024

September 11, 2026

11 Rue Laurier

Renovation, Site Work

No Information to Display

$14,000,000.00

Public - Federal

img_map_placeholder

11 Rue Laurier, Gatineau, QC

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000256780 Question Acceptance Deadline 2023/10/12 05:00:00 PM EDT The Place de Portage III facility was built in the 1970's and will be rehabilitated into a modern complex to update and modernize the base building services. It consists of nine (9) towers varying from 3 to 18 floors, which includes a connecting 3-storey bridge over Maisonneuve Boulevard. The anticipated Scope of work includes, but is not limited to, the following: Supply and installation of concrete, reinforcing steel, carbon fiber reinforcement, removal of walls (all stories), curbs, housekeeping pads, ramps and cast-in-place concrete steps, slab on grade, concrete infills, drilling and doweling for seismic reinforcement, various deteriorated concrete/epoxy repairs, temporary shoring, and other elements to facilitate new concrete upgrades. Stage 1 base building includes Towers B3, B1, C1, C2, D and is currently ongoing. Stage 2 includes Towers A1, A2, B2, E. Based on the available design information, the preliminary estimated costs for the various tender packages are CAD $14,000,000. During construction of this project, there will be several other projects on-going. Work of this project must be coordinated accordingly between these concurrent projects, while maintaining the required separation of time and space so that the responsibilities associated with "Constructor" remain with the Construction Manager. Official bid documents must be obtained from www.merx.com

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects