Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

January 1, 2024

May 31, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

Multiple Locations, Atherton, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

This single-phase, project-specific Alameda de las Pulgas Corridor Traffic and Safety Improvement Project (Project) is funded with Federal dollars requiring the Consultant to follow all pertinent local, State, and Federal laws and regulations. The main components of the Project include, but is not limited to, design services for: Removal of the existing mid-block signal, its signal components, and bulb-outs on ADLP between Mills Avenue and Camino al Lago; Signalization of the intersection of Alameda de las Pulgas at Camino al Lago; Signalization of the intersection of Alameda de las Pulgas at Atherton Avenue; Geometric modifications, including squaring the intersection through the removal of the channelized island, at the Atherton Avenue intersection; Civil Infrastructure (curb ramps, curb, gutter, drainage, and etc.); Green infrastructure and stormwater treatment improvements on ADLP at the intersections of Camino al Lago and Atherton Avenue; and Complete Streets and Safety improvement, including Signing and Striping, for the entire Alameda de las Pulgas corridor between Stockbridge Avenue and the Mills Avenue.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.