Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 3, 2023

May 1, 2024

October 31, 2024

US-40 & Main St

Site Work

No Information to Display

$150,000.00

Public - County

img_map_placeholder

US-40 & Main St, Steamboat Springs, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Community of Milner Wastewater Treatment Plant Request for Qualifications (RFQ) for Prequalification of Contractors for the Wastewater Treatment System Improvement Project Pre-Qualification: Yes The Routt County Environmental Health Department owns and manages the wastewater treatment system for the Community of Milner. The facility is rated to treat 32,500 gallons per day. It is seeking Statements of Qualifications from qualified contractors to replace the existing wastewater treatment system. The new facility will feature a containerized Membrane Bioreactor (MBR) treatment process. The existing 1980s lagoon treatment system will be emptied of its contents and decommissioned. The following is a partial list of the anticipated services required from the general contractor: o Mobilization o Permits o Excavation o Site work and erosion control o Utility connections o Installation of a cast-in-place concrete tank o Procurement of treatment equipment o Installation of loose treatment process equipment o Piping connections between the container and loose equipment installed in the basins o Installation of line voltage from transformer to containerized system o Electrical connections for equipment installed in the basins o Backup power generation o Removal of the sludge in the existing lagoons o Reclamation of the existing lagoons o Startup services o Warranty support

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects