Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

April 1, 2024

December 13, 2024

Multiple Locations

Site Work

No Information to Display

$75,000.00

Public - City

img_map_placeholder

Multiple Locations, Kalamazoo, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

It is the intent of these plans and specifications to provide for a contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for Tank Level Control Valve Replacement at Gull Water Tower and Beech Water Tower as described in the specifications and bid document. The project involves the replacement of existing altitude valves and associated fittings at two water towers with new motor actuated butterfly valves and associated pipe and fittings as provided in these specifications, drawings and as detailed on the included Harold Beck and Sons, Inc, Quotes # RLG-23-151806 and RLG-23-151808. Alternative valves and/or actuators shall not be allowed. Contractor is responsible for: All removals; Purchase and installation of the new actuated butterfly valves, supports, pipe and fittings, including disinfection of all pipes, fittings and valves immediately before installation; Disposing/recycling all removed valves, pipe, fittings, etc.; Providing all necessary equipment, labor and supplies to complete the project; Verifying the weight of existing valves prior to beginning the work and ensuring provided equipment is capable of safely lifting, transporting and loading existing valves, etc.; Verifying the accuracy of all measurements and ensuring that supplied and installed equipment is in compliance with project specifications and drawings and City of Kalamazoo Standard Specifications for Water Main and Service Installation 2021; and Cutsheets shall be provided to City for review and approved by the City prior to Contractor mobilization. Upon completion of an acceptable pressure test, the City will perform bacteriological sampling of installed pipe and fittings (at no cost to the Contractor). Contractor is responsible for re-disinfecting and flushing until acceptable bacteriological sample results are obtained. City will perform all electrical work. Questions about this IFB should be directed to: Department Contact: Eric Sajtar, P.E., Senior Civil Engineer at sajtare@kalamazoocity.org Keeping the water towers in service during construction is preferred. If this is not possible, the Contractor shall conduct their work in such a manner that each water tower is offline for no longer than one week each, including 72 hours for sampling and analysis. In no event, shall both water towers be offline at the same time. Work shall be completed before April 1, 2024 or between November 1, 2024 and December 13, 2024 Questions may be emailed to Eric Sajtar at sajtare@kalamazoocity.org by 10:00 a.m. on October 11, 2023. Questions regarding terms, conditions and other related bid requirements may be addressed to Kyle Dunn, Buyer at (269) 337-8720 or email dunnk@kalamzoocity.org.

65 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects