Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 26, 2023
November 27, 2023
No Information to Display
Multiple Locations
Outdoor Lighting, Site Work
No Information to Display
$100,000.00
Public - City
Multiple Locations, Sumrall, MS
Town of Sumrall Main Street Lighting Project Proposals shall be submitted in duplicate only upon the blank bid forms provided with the drawings and general conditions and scope of work and must be accompanied by Bid Security in the form of a certified check or acceptable bid bond in an amount equal to at least five percent (5%) of the base bid. Said security to be forfeited, as liquidated damages, not penalty, by a bidder who may be awarded the contract, but who fails to carry out the terms of the proposal, execute the contract and post the required performance bond in the form and amount, and within the time specified. The bid bond, or the certified check, if used in lieu thereof, shall be payable unconditionally to the Town of Sumrall. For questions related to the contract documents, please contact The Walker Associates at 601-583-2127. The Town of Sumrall reserves the right to reject any and all bids and to waive informalities. No Bidder may withdraw his bid within 60 days after the date of opening thereof. A. Prior to beginning work, survey existing electrical systems. Document, in writing, signed by the Owner any portions of existing systems that are not operating properly before construction begins. Any electrical systems found inoperable at the end of the construction process that has not been so documented shall be repaired at the end of construction. B. Remove electrical equipment in areas being demolished, and electrical equipment feeding other equipment being demolished. Remove raceways and circuitry back to the panel of origination. Where raceways are installed in inaccessible areas, remove conductors back to the panel of origination. Where circuits are not being completely demolished, remove conductors back to a junction box or other connection point outside of the renovated area and recircuit existing electrical equipment that is to remain as required. Where necessary, completely refeed existing electrical equipment that is to remain. It is the intent of this specification that all existing equipment to remain be left completely operable at the end of the construction process. C. Survey existing panelboard circuitry and provide new typewritten directories giving complete as-built circuitry information for all panelboards affected by the construction on this project. D. Where new circuit breakers are installed in existing equipment, the new circuit breakers shall be manufactured for installation in that equipment. The Amperes Interrupting Current (AIC) Rating shall equal the AIC rating of the existing equipment. A breaker with a lower AIC rating may be used if the contractor provides calculations showing that the breaker rating is sufficient to handle the available fault current. Submit these calculations for approval prior to ordering the breaker. An AIC rating on an existing breaker in the panelboard or switchboard does not demonstrate sufficient proof that the available fault current is less than that breaker's AIC rating
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Sumrall, MS
Bid Date: Oct 26 2023
Sumrall, MS
Bid Date: Oct 26 2023
Sumrall, MS
Bid Date: Oct 17 2024
Flowood, MS
Bid Date: Oct 24 2023
Amory, MS
Bid Date: Nov 02 2023
Gulfport, MS
Bid Date: Nov 02 2023
Olive Branch, MS
Bid Date: Oct 16 2023
Prentiss, MS
Bid Date: Nov 03 2023
Meridian, MS
Bid Date: Nov 09 2023
Amory, MS
Bid Date: Oct 31 2023
Bay Saint Louis, MS
Bid Date: Nov 29 2023
Corinth, MS
Bid Date: Nov 14 2023
Gulfport, MS
Bid Date: Nov 06 2023
Forest, MS
Bid Date: Nov 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
