Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 11, 2023
November 13, 2023
No Information to Display
To Be Determined
Renovation
No Information to Display
$58,670.00
Public - City
To Be Determined, Hopatcong, NJ
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Reference Number 0000330485 Question Acceptance Deadline 10/06/2023 02:00 PM EDT Questions are submitted online Yes Specification for containment fill station with control panel. Product must be manufactured in the United States of America. The fill station shall be designed for a maximum input pressure of 6000 PSI. The fillstation shall be constructed of 1/4" steel plate and steel tube fill pockets. The filling station shall be finished with a highly durable powder coat. The fillstation shall fully enclose two SCBA or SCUBA cylinders while being filled. Venting shall be provided to allow air from a ruptured cylinder to escape the fill station while being directed away from the fill station operator. . The fillstation doorshall utilize gasshocksto allow opening and closing with minimal operator effort. A safety interlock shall be provided that will prevent refilling of cylinders unlessthe fillstation door is securely closed and latched. The latching mechanism shall provide the user with optional manual lockout capabilities. Two fill hosesshall be located within the fill station. Each hose shall have a bleed valve and a fill adapter of the buyer's choice. The fillstation shall be tested and certified lo at least! 5700 PSI burst pressure by an independent third party. The fill station shall meet and exceed the standards and requirements set forth by NPA 901-2016. Control Panel The fill station shall be equipped with a cascade control panel that provides the following standard features: o 4 Cascade hank controls valves o Dual High Pressure Aluminum Manifolds o 4 Cascade bank pressure gauges 2 1/2" liquid lilied o Adjustable fill pressure regulator o Pressure regulator input and output gauges 2 1/2" liquid filled. o 2-cylinderJill valves o 2 Fill pressure gauges 2 1/2" liquid filled. o I regulated auxiliary fill valve
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Hopatcong, NJ
Bid Date: Aug 22 2023
Hopatcong, NJ
Bid Date: Aug 31 2023
Kingwood, NJ
Bid Date: Nov 02 2023
Salem, NJ
Bid Date: Nov 09 2023
Little Egg Harbor Twp, NJ
Bid Date: Sep 26 2023
Edgewater, NJ
Bid Date: Nov 09 2023
Lakewood, NJ
Bid Date: Nov 02 2023
Camden, NJ
Bid Date: Oct 31 2023
Mansfield, NJ
Bid Date: Oct 25 2023
Toms River, NJ
Bid Date: Nov 28 2023
Long Branch, NJ
Bid Date: Oct 18 2023
Asbury Park, NJ
Bid Date: Nov 02 2023
Blairstown, NJ
Bid Date: Oct 27 2023
Kearny, NJ
Bid Date: Oct 26 2023
Freehold, NJ
Bid Date: Nov 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
