Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

December 18, 2023

October 13, 2024

Multiple Locations

Renovation

No Information to Display

$5,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Laredo, TX

Subscribe to View Full Documents

United Independent School District is requesting Competitive Sealed Proposals for United ISD Alexander HS, LBJ HS, & United South HS Chiller Replacement Include in the Base Amount Scope of Work Proposal Amount and in the Construction Contract, a Contingency Allowance as noted below, for use upon Owner's instructions, with a stipulated price amount as indicated below: 1. Application 1 - Chiller replacement at John B Alexander High School and Lyndon B. Johnson High School ($200,000.00 Contingency Allowance) 2. Application 2 - Chillers replacement at Lyndon B. Johnson High School & United South High School ($200,000.00 Contingency Allowance) Substantial completion within three hundred (300) calendar days from notice to proceed. Liquidated damages ($1,500/day unless greater amount noted on UISD general conditions and/or contract provisions) will be assessed if the project is not Substantially Complete. Substantial completion requires that the following have taken place (all may not apply): - AHJ inspection are conducted - Mechanical, Electrical, and Plumbing TCO's received. - Fire TCO received. - Building TCO received - Electrical power permanently restored to all existing electrical circuits on campus. - Potable water permanently restored to all areas on campus. - All system work complete and fully operational - All new HVAC equipment installed and fully operational including controls. - All DDC graphics and remote interface fully operational The Owner reserves the right to reject warranties and to limit selection to products with warranties not in conflict with requirements of the Contract Documents. Question Cuttoff Date & Time 10/10/2023 03:00:00 PM (CT)

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.