Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

November 24, 2023

September 24, 2025

Multiple Locations

Renovation

No Information to Display

$700,000.00

Public - City

img_map_placeholder

Multiple Locations, Belton, SC

Subscribe to View Full Documents

Replacement of three (3) existing sewer lift stations - Big O'Neal, Murdock Road, & Chandler Drive - in Belton, SC. The project includes, but is not limited to, new factory packaged sewer lift stations along with new wetwells, gravity and force main sewer reroutes, and miscellaneous appurtenances. Project Location: Belton, SC Sewer Lift Station Replacements project which includes furnishing all materials, equipment, and labor necessary to replace three (3) existing sewer lift stations - Big O'Neal, Murdock Road, & Chandler Drive - in Belton, SC. The project includes, but is not limited to, new factory packaged sewer lift stations along with new wetwells, gravity and force main sewer reroutes, and miscellaneous appurtenances as described below: Big O'Neal: Packaged Sewer Lift Station (1250 gpm at 139-ft TDH) with 12-ft Dia. Wetwell, 55 LF of 10" DIP Force Main, 35 LF of 16" DIP Gravity Sewer, 27 LF 12" DIP Gravity Sewer, & Two (2) 5-ft Dia. Manholes Murdock Road: Packaged Sewer Lift Station (125 gpm at 80-ft TDH) with 6-ft Dia. Wetwell, 102 LF of 4" DIP Force Main, 58 LF of 8" DIP Gravity Sewer, & Two (2) 4-ft Dia. Manholes Chandler Drive: Packaged Sewer Lift Station (125 gpm at 56-ft TDH) with 6-ft Dia. Wetwell, 79 LF of 4" DIP Force Main, 34 LF of 8" DIP Gravity Sewer, & Two (2) 4' Dia. Manholes A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder's maximum Bid price *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Question Deadline 10/18/2023

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects