Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

January 1, 2024

December 31, 2024

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - County

img_map_placeholder

Multiple Locations, Union, MO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

October 2, 2023 10:00 A.M. Deadline for Submitting Questions October 5, 2023 4:30 P.M. Deadline to post Addendum SPECIFIC REQUIREMENTS 1. Contractor must be able to provide Concrete Materials to the requesting departments, which meet or exceed the specifications contained in this document. 2. Franklin County will purchase concrete materials as needed from a particular supplier based on price per ton, distance to the jobsite and availability of the specific concrete material. Actual orders will be needed in varying quantities and type by project location. 3. Delivery charge shall include material cost and all costs associated with loading, hauling and unloading. 4. Concrete material and concrete blocks shall meet specifications as noted in Sections 1005, 1019, 1054 and 1070 in the latest edition of the Missouri Standard for Specifications for Highway Construction. 5. Rebar shall meet specifications as noted in Section 1036 in the latest edition of the Missouri Standard for Specifications for Highway Construction. 6. Flowable Fill shall meet specification as noted in sections 1018, 1019, 1054 and 1070 in the current edition of the Missouri Standard for Specifications for Highway Construction. 7. Franklin County, at its own expense, reserves the right to sample any material, for the purpose of having an independent laboratory test of the material for conformance to specifications. Product that does not meet specifications will cause all of the shipments to be returned at the bidder's expense. 8. This Contract will have the option to renew on a year by year basis, up to three years in total. The County also reserves the right to terminate and/or cancel the contract in writing prior via a formal contract amendment issued by the Purchasing Department The Purchasing Department, on behalf of Franklin County is seeking bids for Concrete Materials. Contract Period: The contract period shall be for one year January 1, 2024 thru December 31, 2024. This Contract will have the option to renew on a year by year basis, up to three years in total. The County also reserves the right to terminate and/or cancel the contract in writing prior via a formal contract amendment issued by the Purchasing Department.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects