Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2023

November 22, 2023

No Information to Display

2011 S Jackson St

Renovation

No Information to Display

$10,050.00

Public - City

img_map_placeholder

2011 S Jackson St, Jackson, MI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Reference Number 0000332531 No pre-bid will be held; contractors may contact the homeowner to schedule a date and time to access the property to better understand the project's of work, if necessary. The work includes the following partial listing of items with approximate quantities: REMOVAL AND REPLACE ALL EXISTING HOT AND COLD SUPPLY LINES. inTSALL NEW KITCHEN SINK WITH FIXTURES. INSTALL NEW BATHROOM FIXTURE, SINK, AND BATHTUB. TWO EXTERIOR SPICKETS AND NEW SUPPLY LINE FEEDING WASHER. Bidders will be required to comply with Title VI of the Civil Rights Act of 1964, Title VIII of the Civil Rights Act of 1968 (Public Law 90-284), the Michigan Civil Rights, Act 453 of 1976, the Michigan Fair Employment Practice Act (MCL 423.301-423.311), related statues and implementing rules and regulations, Section 504 of the Rehabilitation Act of 1973, and the rules of the Michigan Civil Rights Commission, or demonstrate the existence with standards for equal employment opportunity established by the City of Jackson. The City of Jackson does not discriminate on the basis of religion, race, color, national origin, age, sex, height, weight, handicapped, or marital status as to: access, availability, employment, or participation in any of its programs and activities. P10 - PLUMBING - TO CODE Correct all active violations of the Michigan Plumbing Code affecting existing dwellings. **I, thePlumbing Contractor, shall perform thefollowing alterations, additions, or modifications to the existing plumbing system so astocorrect allcode violations. I shallfurther agree that upon completion, the structure shall be incompliance with the respective codes and permit requirements forthe agreed contract price.** Include the following: 1. Remove allexisting hot and cold supply lines, toinclude lines feeding sinks,Bathtub, water heater, washer, and exterior spigot. (Starting at the meter) 2. Run new hot and cold supply's according to MRC 2015 codes. PEXcan be used. 3. Install of a new Kitchen sink with fixtures. 4. Install of a newbathroom fixture, sink and Bathtub. 5. Two newexterior spigot, one north and one south. 6. New supply's feeding the washer

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.