Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 17, 2023
November 16, 2023
January 30, 2024
1 Hawk Dr
Renovation
No Information to Display
$79,000.00
Public - State/Provincial
1 Hawk Dr, New Paltz, NY
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The scope of work for this project consists of modifications at the main and guest bathrooms and kitchen at the Presidents Residence. The main features of the work shall include, but are not limited to the following: At Main Bathroom: Removing existing shower system, along with gypsum walls at this area, countertop with integral sinks and faucets, wall hung medicine and lighting fixture cabinet, raised tile step with jacuzzi tub, along with associated tiled wing walls enclosing tub, all wall tile surrounding tub area, removing and modification of all associated plumbing supply and drain lines complete, floor tile complete, along with temporary removal of toilet for floor tile work, and removal of existing door and frame between sink and toilet area. Providing and installing new double door closet with adjustable shelving, solid countertop with surface mounted sinks and faucets, wood framed gypsum wall under counter to conceal existing plumbing supply and drain lines, surface mounted LED mirror, walk-in shower with premanufactured base and drain, wall tile around shower area, shower floor tile, rain shower and wand system with control valve and drain assembly, sliding shower door system, floor tile throughout, painting throughout, modification of plumbing for new shower, wood door and frame between sink and toilet area, and reinstallation of toilet. At Guest Bathroom: Removing existing wood door with door frame and associated moldings, countertop with integral sinks and faucets and drain assemblies, base cabinet systems, mirror and wall tile at door removal area, and modification of all associated plumbing supply and drain lines complete. Store coat hook rack and door hardware until reinstallation. Contractor to be advised that existing door, door frame and associated moldings shall be carefully removed under abatement and any repair work or spackling at existing GWB after removals shall be completed without disturbance to existing GWB and in coordination with the asbestos report. Providing and installing new wider wood door with door frame, ADA Compliant vanity with engineered stone countertop and sink, faucet, ADA Compliant grab bars with secure mount installation system at toilet area, freestanding double door linen cabinet, painting as noted, modification of plumbing supply and drain at sink area, and reinstallation of door hardware, coat rack, and moldings. At Kitchen: Removing existing countertops and backsplashes, windowsill, sink assembly, faucet, sprayer, drain assembly, porcelain tile flooring, desk base cabinets, floor moldings, bookcase and miscellaneous furniture items as necessary, including temporary removal of garbage disposal and all duplex and switch covers in order to perform the work. Contractor to be advised that all backsplashes shall be carefully removed from existing gypsum wallboard (GWB) under abatement and any repair work or spackling at existing GWB after removals shall be completed without disturbance to existing GWB and in coordination with the asbestos report. Providing and installing new quartz countertops, stone textured backsplashes, cork board on wall at desk, painted wood windowsill, workstation sink system, faucet with sprayer, drain assembly, and porcelain tile flooring as shown on drawings, including modification of plumbing water supplies and reinstallation of all floor molding, desk base cabinets, bookcase, garbage disposal, duplex and switch covers, and miscellaneous furniture that was removed. Adherence to phasing of work and completion date as stated on drawings and as per below. Contractor to be advised that exterior work at the President's Residence may be ongoing during this project and shall make proper accommodations to provide and maintain full access and egress in and out of building entry locations, parking lot, and all non-work areas. Contractor, Contractors employees, and all sub-contractors to Contractor shall park employee vehicle(s) in the College approved location during all times of work, no exceptions. Providing all labor, supervision, project coordination, tools, equipment, demolition, legal removals, and the legal recycling, disposal, and reporting of all construction waste for the renovation of spaces and work. Contractor shall be fully responsible to review all existing conditions, all dimensions, all existing items to remain, all material quantities necessary in coordination with new work indicated or shown prior to bidding. Contractor shall provide daily project clean-up of debris created by the Work, restoration of existing adjacent areas disturbed by this contract work, and Contractor shall leave work area in a ready to use condition without the College having to clean any areas of work where Contractor performed work. All work shall be completed in accord with applicable manufacturer's materials standards, applicable NY State Building Code requirements, and applicable Federal & State regulation. Contractor shall follow and adhere to the Campus Impairment Program, and especially in regard to any welding work, and Contractor shall not disrupt the existing campus fire alarm system during the work, no exceptions. All dumpsters and storage trailers shall have solid wood members placed under wheels of these items to protect existing conditions, and dumpsters shall be placed on asphalt paving, unless approved in advance by College. Locations of these items must also be approved by College before any deliveries or installation, no exception. Work Not Included: Work not included in the work of the Contract shall be coordinated with the college, and shall include the work listed below, but not be limited to the following: Any direct work associated with other projects by the College or by other Contractors near the work areas, but Contractor for this project shall coordinate their work as necessary. Other Work not included in the work of this Contract are those items marked "N.I.C"; and/or work specifically specified or indicated on the drawings, marked "by others" or "by University " or by College". The project shall commence upon award of contract, but actual construction shall be completed within 45 days of the Notice To Proceed. An additional 30 days will be added beyond the construction work period to allow for administrative paperwork, such applications for payment and closeout materials. All work on this Contract is to be completed within/by 75 days after the date of the Notice to Proceed. Bids must be submitted in duplicate in accordance with the instructions contained in the Information for Bidders. Security will be required for each bid in an amount not less than five (5) percent of the Total Bid. The State University of New York reserves the right to reject any or all bids. Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% Service-Disabled Veteran-Owned Business Contracting Goal: 6%
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
New Paltz, NY
Bid Date: Nov 07 2023
New Paltz, NY
--
New Paltz, NY
Bid Date: Oct 25 2023
New Paltz, NY
--
New Paltz, NY
Bid Date: Oct 13 2023
New Paltz, NY
--
New Paltz, NY
Bid Date: Jun 02 2023
New Paltz, NY
Bid Date: Aug 29 2023
Oneonta, NY
Bid Date: Oct 17 2023
Thornwood, NY
Bid Date: Oct 17 2023
Wayland, NY
Bid Date: Oct 17 2023
Brentwood, NY
Bid Date: Oct 17 2023
Schenectady, NY
Bid Date: Oct 17 2023
Brentwood, NY
Bid Date: Oct 26 2023
Mayville, NY
Bid Date: Oct 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
