Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2023

November 2, 2023

December 14, 2023

555 Airport Way

Outdoor Lighting, Paving, Site Work

No Information to Display

$200,000.00

Public - County

img_map_placeholder

555 Airport Way, Camarillo, CA

Subscribe to View Full Documents

Camarillo Airport Airport Rotating Beacon Replacement Project which consists of the following major work items: Airport Rotating Beacon Replacement Project: Installation of new LED, L-802A(L) rotating beacon and 75-foot-high tip-down tower adjacent to the airfield electrical vault building. Installation of tip-down tower foundation. Installation of electrical infrastructure and components (electrical box(es), conduit, cable) to provide power from the airfield electrical vault building to the new beacon. Asphalt pavement patch. For technical questions concerning the bidding documents email Project Manager: Rafael Gonzalez at rafael.gonzalez@meadhunt.com. No questions will be answered after 5:00 pm on September 27, 2023. (See Proposal (Bid), Instructions to Bidders, Item 4 for further information.) PLEASE DO NOT CALL THE UNDERSIGNED. Public Works Contractor Registration Law (SB 854) Per Public Works Contractor Registration Law (SB 854), Contractors and Subcontractors who intend to Propose (Bid) or perform work on this Project must be registered with the Department of Industrial Relations at the time of Contract award. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Required Contractor's License(s) Proposers or Bidders shall have a Class A or C-32 California Contractors license, at the time of award. Bids Proposals (Bids) must be submitted utilizing the complete original Proposal furnished with said documents. Each Proposal (Bid) must be accompanied by a Bid Guarantee (Bid Bond) in the amount of not less than 5% of the amount Proposed (Bid), PAYABLE to the COUNTY of VENTURA and guaranteeing that the Proposer (Bidder) will enter into a Contract in accordance with the terms of the Proposal documents (Bid Form) if award is made to them. The Bid Guarantee shall be in one of the following forms: 1) a Bid Bond written by an admitted surety insurer on the form included with the Proposal, 2) a cashier's check drawn by a National bank, a check certified by a National bank or 3) cash. An electronically transmitted copy (FAX) of the Bid Bond form included in the Proposal form may be used, but the form must have the original signatures of the Principal and Surety. A Faxed copy of the completed bond will not be accepted. The County of Ventura shall have the right to reject any Proposals (Bids) presented in accordance with Section 20150.9 of the California Public Contracts Code. The Proposer or Bidder to whom award is made will be required to furnish a Performance Bond and a Payment Bond, each in the amount of 100% of the Contract Price. In accordance with Section 22300 of the Public Contract Code, securities may be substituted for funds withheld. Prevailing wage rates Contractor will be required to pay employees and keep records in accordance with the Davis Bacon Act (29 CFR Part 5) and/or the Federal Fair Labor Standards Act (29 CFR part 201). The higher of either the State or Federal wages must be paid to employees. Personally visit the worksite before submitting your Proposal (Bid) to ascertain the existence of any surface or subsurface conditions affecting the cost of the work.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects