Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

February 11, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$805,479.00

Public - City

img_map_placeholder

Multiple Locations, Lincoln Park, NJ

Subscribe to View Full Documents

Improvements at Comly Estates Phase 2. The project limits include the entire length of Parsons Road (1,800 LF), Van Riper Court (370 LF), and Samual Court (526 LF), and a partial length of Anthony Boulevard (1,490 LF), Frances Road (1,063 LF), and Stephen Avenue (1,119 LF). The total project length is approximately 6,611 linear feet (1.252 miles). The scope of work includes, but is not limited to: resetting existing manholes; replacement of existing catch basins with pre-cast catch basins; replacement of storm inlets and castings; removal of existing damaged curbs and installation of new concrete curbs; asphalt milling and road resurfacing; replacement of traffic control signs; and, traffic striping. Each bid shall be accompanied by a Guarantee in an amount of the lesser of ten percent (10%) of the total bid price or Twenty Thousand Dollars ($20,000.00), in the form of a certified check or cashier's check payable to the Borough or a Bid Bond issued by a Surety authorized to transact business in New Jersey and found acceptable by the Borough. Each bid must also be accompanied by the consent of a similarly acceptable Surety, guaranteeing a one hundred percent (100%) Performance Bond and a one hundred percent (100%) Labor and Material Payment Bond will be furnished upon award of the Contract. The total project length is approximately 6,611 linear feet (1.252 miles). The scope of work includes, but is not limited to: resetting existing manholes; replacement of existing catch basins with pre-cast catch basins; replacement of storm inlets and castings; removal of existing damaged curbs and installation of new concrete curbs; asphalt milling and road resurfacing; replacement of traffic control signs; and, traffic striping. The Borough reserves the right to reject any or all bids, to waive any informalities, deviations or omissions in any or all bids, and to accept such bids and make awards as may be most advantageous to the Borough. Estimated budget: $775,000 to $850,000

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects