Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 1, 2024

September 1, 2024

1900 N Keene Way Dr

Renovation

No Information to Display

$640,000.00

Public - City

img_map_placeholder

1900 N Keene Way Dr, Medford, OR

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Professional of Record Nmhs Gym Seismic Retrofit. Medford School District (the "District") was awarded a Seismic Rehabilitation Grant through the Infrastructure Finance Authority: Business Oregon. As part of this grant, preliminary rehabilitation feasibility reports and cost estimates shall be used to ensure the project is in compliance with grant requirements. The District is seeking proposals for the architectural, structural, mechanical and electrical design for the Seismic Rehabilitation of NMHS located at 1900 N. Keene Way, Medford, OR 97504. The district reserves the right to (1) reject any Proposal not in compliance with all prescribed public bidding procedures and requirements, (2) to add to the price bid by nonresident bidders an increase equal to the percent preference that the nonresident bidders home state would give it's instate bidders and (3) to reject for good cause any or all Bids that are not in the best interest of the district (4) to reject any or all proposals, in whole or in part, to waive any formalities and to delete items prior to making the award, whenever its is deemed in the sole opinion of Medford School District to be in its best interest Construction is anticipated to start in June of 2024, with the Project being substantially completed by September 1, 2024. The method of Contractor Selection has not been Determined at this time.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.