Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2023

June 17, 2024

August 16, 2024

Multiple Locations

Renovation

No Information to Display

$700,000.00

Public - City

img_map_placeholder

Multiple Locations, Abington, PA

Subscribe to View Full Documents

This project consists of playground renovations at four different schools within the Abington School District: Copper Beech Elementary School, Rosyln Elementary School, Rydal East Elementary School, and Rydal West Elementary School. Renovations include but are not limited to the following: . Removal and disposal of existing wood mulch play surfacing. . Removal, disposal, and replacement of existing deteriorated timber play surface edging. . Removal and disposal of existing play structures as noted on plans. . Removal and disposal of lawn and earthen subgrade for expanded play surface areas. . Provide and replace missing and/or damaged components of existing play structures. . Provide and install new play surfacing with new engineered wood fiber surfacing and subbase materials. . Provide and install new play structures with associated concrete footings. . Provide and install a new concrete ramp for access to a new play structure. . Provide and install new handrails along an existing concrete ramp. . Provide and install a new bituminous asphalt access path. . Fine grading and seeding of damaged and regraded lawn areas. . Grow-in responsibility for newly seeded areas. . Alternate bids for poured-in-place rubber play surfacing with subbase drainage piping, as well as, other alternate bids detailed within the project manual. Bulletin No. 752 Playground Renovations. For Copper Beech Elementary School 825 Easton Road, Glenside, PA 19038 Roslyn Elementary School 2565 Susquehanna Road, Roslyn, PA 19001 Rydal East Elementary School 1160 Huntingdon Pike, Huntingdon Valley, PA 19006 Rydal West Elementary School 1231 Meetinghouse Road, Huntingdon Valley, PA 19046 A Bidder Qualification Form is required of all bidders in accordance with the Instructions To Bidders. The Abington School District reserves the right to waive any informalities in or reject any and all bids or select a single bid item from any bid.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.