Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

December 25, 2023

January 12, 2025

1577 Dam Site Rd

Renovation

No Information to Display

$1,170,000.00

Public - County

img_map_placeholder

1577 Dam Site Rd, Conroe, TX

Subscribe to View Full Documents

Question Deadline 10/12/2023 at 11:00 AM CT Any questions submitted via the E-Marketplace System website shall be equivalent of contacting the SJRA Purchasing Department directly. Completed in 2010, the SJRA's General and Administration Building provides over 40 employees with permanent office space and offers locations for all employees with its four conference rooms. The building hosts several community events and trainings as well as SJRA's monthly board meetings and it houses the SJRA's servers in its data center. G&A HVAC System Replacement, hereafter called "Project" is located on SJRA's Lake Conroe Campus (1577 Dam Road, Conroe, Texas 77304) Project no.30107 For Work at facilities, Work of the contract is for the replacement of existing data center CRAC units and outside air units within the building and on the roof. This will include ductwork modifications and new electrical circuits to serve upsized equipment. The project consists of the removal and replacement of the existing HVAC system that serves the data center located on the second floor of the building. The work of this Contract is based upon an identified need to replace failing units that supply critical infrastructure. Generally, the Project includes, but is not limited to, the following base proposal items: o Demolition of existing units consisting of two rooftop air condenser units and two PRCU units that supply the data center. o Demolition of associated ductwork as indicated in the Drawings to modify the in preparation for installation of new units. o Demolition of associated controls and electrical circuits. o Removal and replacement of ceiling grid and acoustic tiles as needed to access the Work. o Removal and reinstallation of light fixtures as needed to access the Work. o Installation of two new rooftop air condenser units including associated refrigerant lines and supports. o Installation of two new PRCU units on the second floor and associated ductwork, refrigerant lines, and supports. o Installation of new electrical circuits, disconnect switches, and circuit breakers serving new units. o Construction phasing to ensure no loss of service of the data center during construction. Generally, the Project includes the following as alternative/add proposal items: o Demolition of existing units consisting of two rooftop air condenser units and two outside air handling units as well as associated ductwork, controls, and electrical circuits as indicated in the contract documents. o Removal and reinstallation of ceiling grid, acoustic tiles, and light fixtures as needed to access the Work. o Installation of two new rooftop air condenser units including associated refrigerant lines and supports. o Installation of two new outside air handling units and associated ductwork, refrigerant lines, and supports. o Installation of new electrical circuits, disconnect switches, and circuit breakers serving new units. Generally, the Project includes the following as extra unit proposal items: o Installation of new doghouse to route new refrigerant lines with insulation from CRAC units and DOA units. Existing doghouse to be evaluated to determine if it is large enough to accommodate new lines and if identified as being undersized, new doghouse to be constructed. o Recertification of the fire alarm system. o Temporary cooling of the data center during construction. Generally, the Project includes the following as cash allowance proposal items: o City of Conroe permit fee. 20-0094, GAPR005.1001.2C001, 2478

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.