Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

November 15, 2023

March 22, 2024

275 Waters Edge Dr

Renovation

No Information to Display

$339,934.00

Public - County

img_map_placeholder

275 Waters Edge Dr, Kissimmee, FL

Subscribe to View Full Documents

SCOPE Work performed under this contract shall include all labor, materials, equipment necessary to provide the completion of gutter install project as shown in the drawings provided by the District This project will consist of installing galvalume gutters and downspouts to aid in water distribution and earth erosion. Option 1. To install galvalume gutters and downspouts to the following buildings, building 5 has approximately 495` of gutters, building 3 has approximately 372` of gutters, and building 1 has approximately 360` of gutters. All gutters will need to have downspouts and gutter screen guards installed. Total linear footage is 1,226`. Option 2. To install galvalume gutters and downspouts on all buildings. The total above will need to be added to this option. Covered PE approximately 148` of gutters, building 2 approximately 414` of gutters, building 4 approximately 428` of gutters, and building 7 approximately 348` of gutters. All gutters will need to have downspouts and gutter screen guards installed as well. The total of gutters for option two with option one added in will be 2,464. Downspout spacing will need to be determined by the installer. Start Date: November 15, 2023 Final Completion: March 22, 2024 Question End Date 10/9/2023 12:00 PM Anticipated Award Date 11/14/2023 If the project cost is $200,000 or more, a performance and payment bond shall be required. The awarded Bidder shall furnish within ten (10) days of notification of award a Performance Bond and a Payment Bond in the amount of 100% of the contracted price, payable to the School Board, Overall percent of SBE/VBE Participation expected: Ten Percent (10%)

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.