Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

November 4, 2023

September 13, 2029

FL-8

Paving, Site Work

No Information to Display

$216,916,955.00

Public - State/Provincial

img_map_placeholder

FL-8, Milton, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Counties: Escambia Road Name: SR 8 (I-10) Limits: at Sr 95 (Us 29) Interchange Project(s): 22247615201(*) 22247615604 22247615607 Federal Aid No: D522069B Total Roadway Length: 2.080 Miles Contract Days: 2140 Total Bridge Length: 0.111 Miles Total Proposal Length: 2.191 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 15 days Description: The Improvements under this Contract consist of major roadway improvements on SR 8 (I-10) @ SR95 (US 29) Interchange in Escambia County from MP 8.898 to MP 11.634 including realignment and widening to add lanes, removal of one existing roadway bridge (480057), cleaning and coating of three existing roadway bridges (480055, 480056, & 480065) with additional traffic railing on bridge 480055, construction of eight new roadway bridges (480279, 480280, 480281, 480282, 480283, 480284, 480285, & 480286), removal of the existing CSX Railroad bridge (480058), construction of two new CSX Railroad bridges (480287 & 480291), interchange improvements, and lane modifications at US 29 (SR 95). Work includes stormwater systems, stormwater ponds, signalization, sidewalks, noise walls, lighting, signing & pavement markings, and ITS. The preceding work will be included under FPID222476-1-52-01. Utility work by highway contractor will include water main relocation for ECUA (FPID 222476-1-56-04) and gas main relocation for Pensacola Energy (FPID 222476-1-56-07). There Will Be a Mandatory Pre-bid Meeting for This Project at 10:00 Am Cst on Friday, September 8, 2023 At the Florida Department of Transportation, Milton Operations Center Auditorium6025 Old Bagdad , Highway, Milton, Fl 32583. If You Have Any Questions Concerning This Matter, Please Contact Eric Saggars at (850) 849-3278. This Pre-bid Meeting is Mandatory Because of the Complexity of the Project. Only Plans and Specifications Will Be Available Prior to the Pre-bid Meeting. The Prospective Bidder Shall Be Prequalified According to the Requirements of Fdot Rule Chapter 14-22 and Section 2-1 of the 2019 Standard Specifications for Road and Bridge Construction. Proposals (Bidding Documents) Will Be Issued Only to the Prospective Bidders Who Have Attended the Pre-bid Meeting and Met the Florida Department of Transportation Qualifications for This Project. Question Deadline 10/18/2023 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 001: Interchange - Add Lanes / Bridge Construction / Milling and Resurfacing / Drainage Improvements

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.