Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 2, 2023
December 1, 2023
April 19, 2024
Multiple Locations
Site Work
No Information to Display
$317,560.00
Public - City
Multiple Locations, Pierre, SD
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
The project is estimated less than $1 million dollars. The CONTRACT SCOPE for the project consists of: CIPP UV Cured Lining of approximately 3100' of Sanitary and Storm Sewers of varying materials sized 8" to 18" located within the City of Pierre. There will be no pre-bid meeting. It is the responsibility of the Bidder to be familiar with the site and the corresponding site preparations. Owner makes no claims as the condition of the site except as identified in the contract documents. Questions may be directed to: Nick Waters, PE City Engineer Phone: 605.773.3056 nick.waters@ci.pierre.sd.us City of Pierre 2301 Patron Parkway Suite #2 Pierre, South Dakota 57501 Bids shall be included in an opaque sealed envelope marked with the project title and name and address of the Bidder and accompanied by the bid security and other required documents. If the bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED - 2023 CIPP SEWER LINING PROJECT" on the face thereof. Bid modifications including withdrawal of bid can be made, after sealed bids have been mailed, per the Bid Manual, Bid Modification Form, Exhibit "A-1" if received prior to bids being due. All bids shall be made in accordance with forms referenced to and/or made part of the proposed contract documents. Full responsibility for the delivery of mailed bids prior to the deadline for receiving bids rests with the bidder. The successful bidder will be required to furnish a contract performance bond and a payment bond in the penal amount of one hundred percent (100%) of the contract price as originally bid or subsequently modified. Question Deadline 09/27/2023
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Pierre, SD
Bid Date: Oct 25 2023
Pierre, SD
Bid Date: Sep 29 2023
Pierre, SD
Bid Date: Oct 26 2023
Pierre, SD
Bid Date: Nov 02 2023
Pierre, SD
Bid Date: Sep 21 2023
Pierre, SD
Bid Date: Sep 19 2024
Pierre, SD
Bid Date: Aug 07 2024
Pierre, SD
Bid Date: Aug 23 2024
Pierre, SD
Bid Date: Oct 12 2023
Pierre, SD
Bid Date: Oct 10 2023
Pierre, SD
Bid Date: Aug 30 2023
Bridgewater, SD
Bid Date: Sep 21 2023
Huron, SD
Bid Date: Oct 16 2023
Aberdeen, SD
Bid Date: Nov 14 2023
Hermosa, SD
Bid Date: Oct 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
