Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 20, 2023

January 19, 2024

Cherry St

Site Work

No Information to Display

$92,195.00

Public - City

img_map_placeholder

Cherry St, Lansdale, PA

Subscribe to View Full Documents

DESCRIPTION The Borough of Lansdale is replacing an existing outfall at Cherry Street, replacing stormwater piping and existing headwall, and performing swale improvements. The scope of work is more fully described in the Project Specifications herein and on the Project Plans. CLARIFICATION DEADLINE 10/10/2023 5:00 PM The Borough of Lansdale is replacing an existing outfall at Cherry Street, replacing stormwater piping and existing headwall, and performing swale improvements. The scope of work is more fully described in the Project Specifications herein and on the Project Plans. U1.03 Work Included A. Base Bid - Mobilization. 1. The assembly and set-up of the general plant required to comply with the contract and with local and state laws and regulations. This includes contractor's offices, shops, plants, storage areas, and sanitary or other facilities. This work includes obtaining the required permits, insurance, bonds, and any other initial items required for the start of the work. B. Base Bid - Maintenance and Protection of Traffic. 1. The Contractor shall erect or place and maintain in good condition, barricades, warning signs, lights, flares, approved yellow-flashing light units, rubber traffic cones, and other warning and dangersignals and devices, appropriate and adequate for the specific needs and subject to the Engineer's approval, at working sites, closed roads, intersections, open excavations, locations of material storage, standing equipment and other obstructions, at points where the usable vehicular or pedestrian traffic width of the road or sidewalk is reduced, at points where traffic is deflected from its normal courses or lanes, and at other places of danger to vehicular or pedestrian traffic. C. Base Bid - Site Clearing. 1. Perform site clearing necessary for the proposed improvements. 2. Remove Trees, as shown on Project Plans. Tree removal shall include stump removal to 12" below proposed grade or any proposed feature. Maintenance Bond 100% Item #20 has been modified to make it a fixed bid allowance item.

80 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.