Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 18, 2023

December 18, 2023

December 17, 2024

Multiple Locations

Site Work

No Information to Display

$25,000,000.00

Public - City

img_map_placeholder

Multiple Locations, San Antonio, TX

Subscribe to View Full Documents

As of 10/25/2023, this project has not yet been awarded. Award details will be made available following December SAWS Board meeting. Sealed proposals are requested by the San Antonio Water System for the removal and installation of up to 160,000 water Meters in various sizes, installation of Endpoints, and associated field work outlined in this document for the Meter and Endpoint Installation Package I Project. For questions regarding this solicitation, technical questions or additional information, please contact Theadora Gonzalez, Contract Administrator, in writing via email to: Theadora.gonzalez@saws.org or by fax to (210) 233-3385 until 4:00 PM (CDT) on October 6, 2023. Answers to the questions will be posted to the web site by 4:00 PM (CDT) on October 9, 2023 as a separate document or included as part of an addendum. Be advised that firms responding to this RFCSP (Respondents) are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or COSA officials regarding this RFCSP up until the contract is awarded as outlined in the Instructions to Respondents. Electronic proposals shall be accompanied by a bid bond in an amount not less than five percent of the total proposal price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total proposal price, SAWS will request this within 24 hours from the Respondent who did not submit a bid bond) Respondents will need to submit a request by 10:00 AM (CDT), October 17, 2023 to receive access to the File Transfer Protocol (FTP) site via email to Theadora.gonzalez@saws.org. Respondent's email requesting access to the FTP site shall provide the legal name of the Respondent's company and the intended recipient's email address and phone number. No requests for FTP site access will be accepted after 10:00 AM (CDT), October 17, 2023 Estimate: $12,500,000.00 - $25,000,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Removal and installation of up to 160,000 water meters in various sizes, installation of Endpoints, and associated field work in connection with the deployment of SAWS ConnectH2O Program.

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.