Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2023

October 23, 2023

August 20, 2024

880 Rue Hudson

Renovation

No Information to Display

$657,000.00

Public - State/Provincial

img_map_placeholder

880 Rue Hudson, Greenfield Park, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference Number : 1764748 Deadline for receiving complaints: 2023-10-03 The project is the first phase in the replacement of the ventilation systems. The FS-9 air-conditioning system, with a capacity of 15,000 l/s, will be completely dismantled and replaced by a system assembled on site. A Volcano gas-fired boiler will also be dismantled. A roof access door will be added to allow equipment entry for all phases of HVAC system replacement.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects