Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

October 14, 2024

October 13, 2025

3115 Conservation Rd

Paving, Site Work

No Information to Display

$200,000.00

Public - County

img_map_placeholder

3115 Conservation Rd, Milton, ON

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Conservation Halton requires an architectural-e design firm to provide detailed design and costing for the replacement of the Boardwalk based on the recommendations in the WSP Inc Report attached as Appendix A. The successful proponent will also oversee all contract administration and construction management processes including preparation of procurement documents for the purposes of tendering the proposed works. Question Deadline: Fri Oct 6, 2023 2:00:00 PM (EDT) Duration in months: 12 The method of Contractor Selection has not been Determined at this time

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects