Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

November 6, 2023

January 5, 2024

101 Rutgers Pl

Site Work

No Information to Display

$705,908.00

Public - City

img_map_placeholder

101 Rutgers Pl, Clifton, NJ

Subscribe to View Full Documents

As of 10/20/23, this project has not yet been awarded. A timeline for award has not yet been established. All questions are to be submitted in writing to the Purchasing Agent, via email at AJARIWALA@cliftonnj.org, or via fax to (973) 470-9456. Disclaimer: Bidders must get the documents from the owner and placed on the official plan holders list in order to submit a bid. If they obtain documents from another source outside the owner, their bid will be disqualified. Ravine Park Sanitary Sewer Improvements. General Description of Ravine Park Sanitary Sewer Improvements: Rehabilitation of the existing sanitary sewer main using proposed cured in place pipe (CIPP) sewer lining and construction of a stabilized access made up of grass turf reinforcement for the length of the existing sewer main to provide access to facilitate maintenance, inspections, and any future repairs. The work contemplated under this Contract shall be completed within calendar days from the date of the execution of the Contract. The CONTRACTOR shall commence the work not later than 10 calendar days after the execution of the Contract. The completion time shall include, but not be limited to, the time necessary to prepare shop drawings, to order, process and deliver all equipment and materials, to obtain necessary permits and approvals, to perform the proper installation contemplated under this contract and all else necessary and incidental in connection with the performance of the Contract. The work to be performed under this contract consists of furnishing all materials, equipment, supplies, labor and transportation, including fuel power, water, and performing all work as required in the Statement of Work in the contract, in strict accordance with the specifications, schedules and drawings, all of which are made a part hereof, and including such detail drawings as may be furnished by the ENGINEER from time to time during the prosecution of the work in explanation of said drawings.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.