Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

No Information to Display

3331 NJ-38

Renovation

No Information to Display

$1,369,000.00

Public - County

img_map_placeholder

3331 NJ-38, Mount Laurel, NJ

Subscribe to View Full Documents

Rowan College at Burlington County, Mount Laurel, New Jersey for the RCBC Evans Hall HVAC Replacement Project at Rowan College at Burlington County, Township of Mt. Laurel, New Jersey together with all work incidental thereto, in. Question Deadline 10/06/2023 at 2:00 PM ET A Certified Check, Cashier s Check, or Bid Bond drawn to the order of Rowan College at Burlington County for ten percent (10%) of the amount of the bid; separate Performance and Payment Bonds, each in the amount of 100% of the contract sum. The right is reserved to reject any or all bids or to waive informalities in the bidding if it is in the interest of Rowan College at Burlington County to do so.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects