Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 6, 2023

June 6, 2024

December 10, 2024

1255 Tefft Ct

New Construction, Site Work

No Information to Display

$1,569,705.00

Public - City

img_map_placeholder

1255 Tefft Ct, Saline, MI

Subscribe to View Full Documents

A new 26,000 SF Operations Center will be constructed on a 7.179 acres vacant parcel at 1255 Tefft Court, Saline, MI. This project is being completed using the Design/Build delivery method. The Design/Build Contractor, AR Brouwer Company, will hold all of the subcontracts for the work and is under contract with the Saline Area Schools as the Design/Build contractor. All subcontractors will be required to comply with the Saline Area Schools requirements described herein, as well as AR Brouwer's contract terms and conditions. In compliance with MCL 380.1267, the bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the board, or the superintendent of the school district. The bid shall also be accompanied by a sworn and notarized statement disclosing whether the bidder is an Iran Linked Business in compliance with PA 517 of 2012. The Board shall not accept a bid that does not include these sworn and notarized disclosure statements. The Board and AR Brouwer Co. reserves the right to waive any irregularities, reject any or all bids, or accept any bid when in the opinion of the Board such action will best serve the District's interest. The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Result WATERPROOFING D. C. Byers Company-$22,800 COMPOSITE WALL PANELS/METAL SIDING Metro Lakes Construction-$102,000 ROOFING/ROOF INSULATION & METAL SIDING Royal West Roofing-$212,000 CAULKING AND SEALANTS D. C. Byers Company-$29,300 HOLLOW METAL DOORS, FRAMES & HARDWARE Tanner Supply-$110,505 DOORS & HARDWARE Clinton Valley Products LLC-$89,000 OVERHEAD DOORS Overhead Door West Commercial Inc-$84,500 GLASS & GLAZING Crystal Glass Inc-$227,100 RTU SCREENWALL PANELS Metro Lakes Construction LLC-$16,800 FUELING STATION R. W. Mercer-$458,100 CATEGORIES: 3B D. C. Byers Company-$22,800 CATEGORIES 3C Metro Lakes Construction-$16,800 CATEGORIES 3F.1 Clinton Valley Products-$89,000 CATEGORIES 3F.2 FRP Clinton Valley Products-$89,000

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.