Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

November 20, 2028

6000 Cullen Dr

Renovation

No Information to Display

$75,000.00

Public - State/Provincial

img_map_placeholder

6000 Cullen Dr, Sabillasville, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Provide all labor, equipment, materials, supplies, insurance (see paragraph 8 below), etc. necessary to perform a full installation of two (2) mini split systems with five (5) air handlers in total, in the Kitchen at the Victor Cullen Center. 1.Contractor to provide and set two (2) pads on existing roof. 2.Contractor to provide and set two (2) Mitsubishi Model MXZSM60NAMU1 units on pads (1 unit per pad). 3.Contractor to provide and mount two (2) Mitsubishi Model MSZGS30NA2U1, two (2) Mitsubishi MSZGL24NAU1, one (1) Mitsubishi MSZGL12NAU2 on interior wall of kitchen and dish room areas. 4.Contractor to provide and mount two (2) Mitsubishi OACMKA32BC Branch Boxes. 5.Contractor to provide and install all line sets, adapters, and fittings needed to connect all components. 6.Contractor to provide and install slim duct to cover all line sets. 7.Contractor to provide and install two (2) disconnects, one (1) at each exterior unit. 8.Contractor to provide all materials needed to wire from main breaker panel to disconnect at each unit. Then from disconnects to exterior units. 9. Contractor is to provide and install needed control wire to and from all units. 10. Contractor is to provide and install five (5) condensate pumps and drainpipe. 11. Contractor is start and check both system for proper operation. This is a SBR Project for a contractor to furnish and install a mini-split A/C System in the Kitchen at Victor Cullen Center, Sabillasville, MD 21780 There is no MBE Goal on this project. Minority Business Enterprises (MBE's) and small businesses are encouraged to respond to this solicitation as a primary Contractor and are encouraged to obtain certification. All questions related to the MBE certification process should be addressed to the Maryland Department of Transportation, Office of Minority Business Enterprise, 7201 Corporate Center Drive, Hanover, MD 21076. You may contact MDOT at 1-800-544-6056 or by e-mail at www.mdot.maryland.gov. MBE Participation Goal: 0% VSBE Participation Goal 0% The Contractor shall have a minimum of five (5) years' experience performing work as specified in this specification.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.