Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

November 24, 2023

No Information to Display

3730 N Oakley Ave

Renovation

No Information to Display

$50,000.00

Public - City

img_map_placeholder

3730 N Oakley Ave, Chicago, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Bell ES - 3rd Floor Carpet Replacement. Only Prequalified Pool Various Trades PLA for work over 25K Questions Due Date: Sep 20th 2023, 10:00 AM CDT Supply and Install carpet tile for 3rd floor corridor install commercial carpet tiles. 1) Remove current carpeting in 3rd floor corridor and new commercial carpet tiles. 2) Remove and provide new oak quarter round stained and varnished to match existing baseboard for the 3rd floor corridor, total sq. yd 1513 to be verified by vendor. 3) Staff to remove all furniture and items from the 3rd floor corridor. 4) Apply diamabrush to floors.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.