Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2023

November 10, 2023

No Information to Display

175 Piedmont Ave NE

Renovation

No Information to Display

$400,000.00

Public - State/Provincial

img_map_placeholder

175 Piedmont Ave NE, Atlanta, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Pursuant to the State Purchasing Act (Official Code of Georgia Annotated 50-5-50 et seq.), this electronic Request for Quotes (eRFQ) is being issued to establish a contract with one or more qualified suppliers who will provide GSU - Piedmont North Boiler Replacement to the Board of Regents of the University System of Georgia by and on behalf of Georgia State University (hereinafter, the State Entity) as further described in this eRFQ. Direct replacement of Aerco Innovation 1060 hot water boiler ser. #G-13-2260 located in Piedmont North - Building A. Direct replacement of Aerco Innovation 1060 hot water boiler ser. #G-12-0171 located in Piedmont North - Building B. NOTE: CO Monitors and emergency shutoff buttons are to be installed at each point of egress Please provide pricing to include equipment, materials, and labor necessary for installation. Provide a full scope of work to include: - Shutdown, lockout/tagout existing Aerco boilers. - Disconnect line voltage and any controls. - Valve off the gas line and bleed excess gas. - Disconnect gas line. - Valve off inlet/outlet water and drain. - Disconnect water lines. - Remove and dispose of the existing boiler properly. - Provide (1) new INN 1060N Aerco boiler. - Provide and install (1) a new Aerco condensate neutralizer kit. - Install new sequencing valve. - Modify existing PVC venting as needed for installation. - Coordinate electrical work as needed. - Confirm existing valves are in good working condition. - Start up boilers and verify proper operation with GSU facilities representative. All labor, permitting, lifts, and taxes are to be included. Pressure Vessel: 10-year warranty Heat Exchanger: 10-year warranty Control Panel: 2-year warranty Question Deadline 09/29/2023 at 2:00 PM ET

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.