Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 13, 2023

November 14, 2023

July 16, 2024

18 Pond St

Site Work

No Information to Display

$100,000.00

Public - City

img_map_placeholder

18 Pond St, Ayer, MA

Subscribe to View Full Documents

The Town of Ayer Department of Public Works (Owner) will accept Sealed Bids for the Kiddie Junction Playground Improvements at Pirone Park. The work involves site preparation, installation of erosion control, rough and final grading, installation of concrete and bituminous concrete walks, preparation of the gravel base for the play equipment areas, coordination with the contractors installing the play equipment and poured in place playground surface, installation of Hillside Slide and Stepping Stone Stairs, installation of Fibar Mulch, installation of black vinyl fence and gate, loaming and seeding, and final close out of the project as shown on the plans and as described herein. The bidding and award of this Contract will be under the provisions of M.G.L. Chapter 30, Section 39M. Complete instructions for filing Bids are included in the Instructions to Bidders. Each General Bid shall be accompanied by a Bid Security in the amount of 5 percent of the Bid. No Bidder may withdraw his Bid for a period of ninety (90) days, excluding Saturdays, Sundays, and legal holidays after the actual date of the opening of the General Bids. This advertisement does not obligate the Owner for any costs associated with preparing or submitting bids. The successful General Bidder must furnish a 50 percent Payment Bond with a surety company acceptable to the Owner. Minimum wage rates as determined by the Commissioner of Department of Workforce Development under the provisions of M.G.L., Chapter 149, Section 26 to 27D, as amended, apply to this project. It is the responsibility of the contractor, before bid opening, to request if necessary, any additional information on Prevailing Wage Rates for those trades people who may be employed for the proposed work under this contract. The Owner reserves the right to waive any informality in or to reject any or all Bids if deemed to be in its best interest.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.